The objectives of the Quebrada Juan Bobo project were to: remove the homes situated on or directly adjacent to the stream (the homes that were at highest risk of being damaged by natural disaster); canalize the Juan Bobo stream; create public space via pedestrian ways, terraces, stairs, bridges, and gardens along the length of the stream; and relocate the displaced families in-situ via new mid-rise apartment buildings.
Juan Bobo Infill & Upgrading Project
April 30, 2014